Product: ZRC Cold Galvanizing Paint (340g spray bottle)
– 1 component paint.
– After painting, the plating layer contains 95% zinc after drying, providing cathodic corrosion protection (UL standard).
– Standard for each kg of paint to cover 4m2 with a thickness of 40µm.
– Meets many international standards such as ASTM-B117-73 (3,000-hour test in salt mist environment), DOD-P-21035A (standard for repairing damaged hot-dip galvanized coating), MIL-P-26915A (zinc material standard) …
– Continuous temperature tolerance is 177oC, maximum is 399oC.
– Solvent used: xylene or petroleum jelly. Solvent mixing ratio 10-20% volume (according to manufacturer's recommendation).
– Made in USA (ZRC Worldwide).
SPECIFICATIONS |
ZRC WORLDWIDE |
Product code |
Aerosol |
Specification |
Spray bottle 340g |
Color |
Light gray |
Origin |
USA |
Characteristic |
Organic base with 99.5% pure zinc compound |
Zinc content in the coating after drying
(ASTM A780 standard)
|
95% |
Specific gravity (kg/liter) |
2.7 |
Solids content in solution (%V) |
52% |
Paint rate 1 coat |
4 m2 |
Paint thickness 1 layer |
35 – 40 μm |
Conductivity of the coating |
75 milli ohms |
Temperature tolerance |
399oC |
Paint film drying time – touch |
5-10 minutes |
Paint film hardening time |
24 hours |
Corrosion resistance life (2 coats) |
15 – 20 years |
Application: |
+) Replace and repair hot-dip galvanized layer:
– Repairing hot-dip galvanized coating damaged by welding, cutting, drilling holes.
– Paint to restore hot-dip galvanized surfaces that have been corroded by the environment.
– Galvanizing at the construction site or production site without having to bring it to a hot-dip galvanizing workshop.
– As an anti-rust primer for metal surfaces combined with traditional topcoat paint to achieve the desired color.
+) Application fields:
– Electric poles, lighting poles, parabolic antennas, radar stations.
– Construction structure: wharf, factory, fence, offshore equipment, tanks, pipelines.
– Maintenance of equipment and accessories in power distribution and transmission systems and power transformer stations.
– BTS telecommunication station.
– Electricity, oil and gas, transportation, aquaculture, industrial plants and public works. |
INSTRUCTIONS FOR USE:
a/ Surface Treatment
– Grease, dirt and humid air can affect the adhesion of the spray film, so clean grease and dirt with alcohol or industrial gasoline to completely dry the surface.
– Clean all rust on the surface with sandblasting gun, grinder or specialized acidic cleaning solutions.
b/ How to Use
– Shake well for at least 1 minute to evenly distribute the solution in the spray bottle.
– Spray evenly on the surface of the material or the area to be sprayed. Keep the spray distance at 30cm.
– Spray a thin layer with a drying time of 15 minutes and a completely hard paint time of 24-36 hours.
– After 12-24 hours, you can apply a second coat.
– After spraying, turn the spray bottle upside down, gently squeeze the spray cap for 2-3 seconds to clear the air tube to avoid clogging when left in the air for a long time.